Eastern Engineering Group

CIVIL ENGINEERING DIVISION

Paving and Drainage Plans

civil engineering Paving and Drainage Plans

Eastern Engineering Group will prepare the Paving and Drainage plans and details to submit them in accordance with the City’s County Public Works Department and the Department of Environmental Resources Management (DERM) Standards and Specifications.

Grading Plans

In order to ensure a level base, or one with a specified slope, for a construction work such as a foundation, the base course for a road or a railway, or landscape and garden improvements, or surface drainage. This will prevent property damage, flooding, standing water, and erosion of embankment areas

Water and Sewer On Site Plans

civil engineering

Plans according to Miami-Dade Water and Sewer Department Standards. This task does not include the design of any private and/or public sewage pumping stations and associated force mains.

Water and Sewer Off Site
(Extension Plans)

reinforced-masonry-structure-for-structural-engineering-division-page-or-any-other-page

Main Extension Plans according to Miami-Dade Water and Sewer Department Standards and Agreement.

Striping and Signage Plans

IMG_1887

Paving, Drainage, Striping, Details and Drainage Calculations, according to Standards and Specifications established by Miami Dade County Public Works Department and the Department of Environmental Resources Management (DERM)

Drainage Inspections

IMG_1390-1

Eastern Engineering Group will inspect the drainage conditions located at the property, in order to provide drainage plans and details to submit them in accordance with the City’s Code.